Hey everyone,
I'm going through my study material for the CISSP, and I'm trying to think of a good way to differentiate between Business Continuity Planning and Disaster Recovery Planning. Some of the text I've seen states that DRP steps in when BCP fails. Is that accurate? Does anyone have a good way of remembering the difference between the two concepts? Thanks!